The work

The architectural plans do not foresee an alteration to the existing structure’s footprint as was built in in 1982 and later refurbished in 1992. The main mission is to render the existing structure compliant with the highest international standards.

Work duration

The construction work started in mid-November 2014 and restarted in 2016. The work is expected to be completed by 2019.

 

Requalification

Hilton Catania Capo Mulini will become a fully eco-sustainable point of convergence for tourism, thanks to the refurbishment works fully focused on utilizing green & cleantech technology.